For the crew
Know when rain is coming before the crew shows up.
RainLog checks the forecast for each job, opens the radar on a phone, and keeps the dated rain record for the PDF.
The first job is free
See the rain count, the calendar, the alerts, the radar, and the PDF for one job before you pay.
Company plan
$20 a month opens every job and the one-page rain impact PDF.
Your login stays yours
Paste the task list or import a CSV. RainLog does not ask for a Buildertrend password.
On the phone
Built for the field
- Alerts when rain is headed to a site, on the job page and by email.
- Live radar you can scrub hour by hour, with the job pinned against the nearest rain.
- Photo capture that stores the time, and the map point when the phone has one, on that rain day.
Alerts include a site-specific checklist — cover materials, protect openings, check drainage.
Sample alert
Rain expected at Sample house
0.40 inches in the next 48 hours.
- Check drainage around the foundation.
Active work: Footings.
Sample alert. Not a live forecast.
The pin is Sample house. The map shows that site and the nearest rain. This view is not a saved job.
How it works
- Add the street address and the date the job became active.
- RainLog locates the address and reads daily precipitation from NOAA. A day counts as rain at 0.10 inches or more. The forecast alert uses the same line.
- Paste the task list, or import a CSV with task name, start date, and end date. Export the PDF, or email it at the start of each month.
Example
What a job looks like
This sample is made up. The blue days are rain, the white days are dry, and the gray day had no reading. The PDF is the one-page summary this job would print.
Sample house
100 Example Lane
Active April 1, 2026 through April 30, 2026. Station Sample station, 12.4 miles.
6 rain days 23 dry days 3 longest streak
From April 1, 2026 through April 30, 2026, this site recorded 6 rain days at 0.10 inches or more, and 23 dry days with a station reading. The longest run of rain days was 3 days, from April 2, 2026 through April 4, 2026. 1 day had no reading from the station and is not counted as dry. Tasks that overlap rain days: Footings (3 rain days), Framing (2 rain days), Drywall (1 rain day). Those are the days most likely to matter in a delay conversation.
Tasks on rain days
- Footings · 3 rain days
- Framing · 2 rain days
- Drywall · 1 rain day
April 2026
Company plan
$20 a month
Free for your first job. Alerts and radar included. The company plan opens every additional job, the calendar, and the PDF. Cancel anytime from the billing page.